|
| |
 |
Chroma Systems Solutions not only designs and supplies Automated Test Systems in Power Supply, Communication, Aerospace, and National Defense industries, but also in alternative energy markets such as Hybrid Automobiles, LED Luminance Devices, Solar, Fuel Cells, and Battery. |
Chroma has a wide variety of instrumentation including AC/DC Programmable Power Sources, Electronic Loads and Digital Power Meters that are ideal for power input/output terminal testing and dynamic simulation. In addition to providing individual units for systems, Chroma also develops powerful software platforms that include extensive built-in test programs. Users can edit the test programs to analyze the massive test data for their research, quality assurance of products, and improvement of the manufacturing process.
Systems have been built to test PC/Servo/Telecom Power Supplies, Adapters and Chargers, Backlight Inverters, LED Driver's, Ballasts for energy saving lamps, UPS's, PV Inverters and Electric Vehicle Chargers. Chroma Systems Solutions can provide automated test systems and the fabrication of test fixtures simultaneously at our design facility in Southern California. Our highly trained technical service team ensures your system will be supported. |
|
 |
|
| |
| 8010
Model PC Power Supply ATS |
 |
| The 8010 PC Power Supply ATS is the test system of choice for PC power testing on the production line. Designed specifically with PC Power supply characteristics in mind, the 8010 customizes standard test items providing excellent test performance and optimization for mass production. The software provides a user friendly interface with intuitive controls suited for the production line. |
|
| |
|
| |
|
| |
| 8020
Model Switching Power Supply ATS |
 |
| The 8020 Adapter/Charger ATS is the best system for testing adapters and chargers in the production line. Testing multiple DUT's concurrently, the 8020 improves productivity significantly. Standard test items optimized for adapter and charger features provide excellent test performance meeting the demands of mass production |
|
| |
|
|
|
|
| 8020 |
Switching Power Supply ATS |
Quote it |
 |
|
| |
|
| |
| 8490
Model LCD Inverter / Ballast Test System |
 |
| The 8490 LCD Inverter Auto Test System is the ultimate solution for LCD inverter testing. Not only can it test traditional DC to AC inverters but the LIPS (LCD Integrated Power Supply) type that combines adapter and inverter in one board as well. |
|
| |
|
|
|
|
| 8490 |
LCD Inverter / Ballast Test System |
Quote it |
 |
|
| |
|
Home | Company | Careers | Products | Support | Services | Training | Request Quote | Contact
© 2009 Chroma Systems Solutions, Inc. / COOLBURN® is a registered trademark of Chroma Systems Solutions, Inc. |
|
|
Our experienced sales engineers can help you select the right instrument for your application. |
| 949-600-6400 |
| Contact sales |
Contact service |
| Request a quote |
Join our e-mailing list to get new product releases, news, and our quarterly report. |
| Subscribe |
| |
| Search site |
|
|
|
|
 |
|
A New Standard for High Accuracy Programmable DC Supplies |
Chroma's new
62000P
Programmable DC power supplies offer many unique advantages for ATE integration and testing. These advantage include a constant power operating envelope, precision read back of output current and voltage, output trigger signals as well as the ability to create complex DC transients waveforms to test device behavior to spikes, drops, and other voltage deviations. The 62000P Series includes 9 different models ranging from 600W to 5000W, up to 120A and up to 600V. |
|
|
 |
Measure Critical Timing Parameters: UPS, Battery, Off-grid Inverters |
Chroma's
63800 AC Electronic Loads are designed for testing uninterruptible power supplies (UPS), Batteries, Off-Grid Inverters, AC sources and other power devices such as switches, circuit breakers, fuses and connectors. Equipped with unique timing measurement functions, the 63800 Loads allow users to measure critical timing parameters such as battery discharge time, the trip time for fuse and breaker testing and UPS transfer time. |
|
|