Latest News

Minnesota Area Roadshow Product Demonstrations

We are taking our test instruments on the road. Chroma engineers will come to your facility and walk your team through features and benefits of our test instruments and systems. Typical hands-on demonstrations with Q&A take about an hour.

When: March 21-25, 2011
Where: Minnesota

Typical Presentation Agenda

1. Introduction
a. Company Overview
b. Products Overview

2. Equipment Rundown
a. Overview
b. Features and Benefits
c. Applications

3. Product Demonstrations

4. Conclusion / Questions

To Schedule Your Live Demo Contact…

Dave Hurd
Regional Manager
(262) 744-2820
Email

RoadShow Feedback

“Thanks to you guys for coming out and giving us the run-down, it was informative and I enjoyed it. Since you were here our engineers have been using the timing function of the load to test the life of some of the large batteries we use in our robots. It was very simple to set up and use for this purpose. I also look forward to using it on our generators as our project manager informed me that there are a list of specs and standards that the generators will have to meet. Having this piece of equipment will ease the process of getting them certified. Thanks again for your time and effort.”

Gerald W. Gregones
Project Engineer / Electrical Qinetiq North America
(Technology Solutions Group)

Show Me Your Roadshow Schedule

More Recent Posts

High-Power Regenerative AC Electronic Load Released by Chroma

Chroma 63800R series presents a highly efficient energy-saving solution for a broad spectrum of renewable energy applications, including ESS, hybrid PV inverters, AC EVSE, and bidirectional on-board chargers (BOBC) for V2L and V2H applications. The regenerative feature, in contrast to traditional AC loads, eliminates wasted heat generation which significantly reduces energy costs.

Read More »

Energy Storage System Testing: How Chroma Battery Simulators Are Transforming Validation Efficiency

Energy storage systems have important and specific parameters for PCS performance, such as a charge and discharge response times not exceeding 0.5 seconds, a minimum sustained runtime of 15 minutes, and a system round-trip efficiency of over 85%. Therefore, PCS need to undergo a range of comprehensive tests, including charge/discharge testing, efficiency testing, and anti-islanding protection testing…

Read More »