Is there an example of an application that requires simultaneous measurement?

Simultaneous measurement is normally required for A vs B type of analysis. For example, one may want to check how power supply output voltage responds to loading current under real application setup (meaning the loading is not controllable). If sequential measurement is used to get the V (output voltage) & I (loading) data, then rapidly changed loading may introduce time related errors (see below).