Latest News

Chroma Introduces a Compatibility Test Solution for Electric Vehicle and EV Supply Equipment (EVSE)

The media recently reported that electric vehicles cannot be charged in public locations due to incompatibility issues, some EV Supply Equipment (EVSE) installed in public locations are not provided by the manufacturer of the vehicle but by secondary manufacturers in the industry. The incompatibility arises from a lack of verification in the communication protocol resulting in a charge failure or other hazardous conditions. This could have a negative impact on the consumer’s adoption of the electric vehicle.

The common accepted global standard for electric vehicle charging is SAE J1772, which defines the technical specification requirements between the electric vehicle and EVSE.  However, it doesn’t provide a unified verification process for communication protocol in a lab approved system. Due to the variance of the manufacturer design and differences in components, the communication problems occur during actual operation resulting in an unsuccessful charge. Electric Vehicle and EVSE compatibility is imperative to consumer buy-in. However, the high costs to develop test system hardware, software and test procedures as well resource allocation has been prohibitive – until now.

Chroma has developed an Electric Vehicle AC Charging Compatibility Test System for the manufacturers of electric vehicles. This has resulted in the world’s first UL approved SAE J1772 EVSE Communication Protocol Automated Test System. The system simulates various states of an EVSE to validate AC charging compatibility before electric vehicle delivery. The solution has been adopted by a Korean electric vehicle plant and Chroma has recently acquired the bid of the Bureau of Standards, Metrology and Inspection (BSMI) as the future evaluation system of Taiwan electric vehicles. The system’s main functions are as follows:

  1. To simulate varied EVSE’s for testing if the electric vehicle can perform accurately or respond appropriately when the pilot signal contains an error; based on the requirements of different regulations.
  2. Test various EVSE communication and responses based on limits outlined in SAE J1772 standard to assure compatibility.

 

More Recent Posts

High-Power Regenerative AC Electronic Load Released by Chroma

Chroma 63800R series presents a highly efficient energy-saving solution for a broad spectrum of renewable energy applications, including ESS, hybrid PV inverters, AC EVSE, and bidirectional on-board chargers (BOBC) for V2L and V2H applications. The regenerative feature, in contrast to traditional AC loads, eliminates wasted heat generation which significantly reduces energy costs.

Read More »

Energy Storage System Testing: How Chroma Battery Simulators Are Transforming Validation Efficiency

Energy storage systems have important and specific parameters for PCS performance, such as a charge and discharge response times not exceeding 0.5 seconds, a minimum sustained runtime of 15 minutes, and a system round-trip efficiency of over 85%. Therefore, PCS need to undergo a range of comprehensive tests, including charge/discharge testing, efficiency testing, and anti-islanding protection testing…

Read More »